Fallon RidgeConstruction Start a project

Our work

On the boards now

Three jobs in progress. Each one runs through the client portal, so the owner sees the same schedule, photos and plans we do.

Steel stud framing in a dental suite with open ductwork
in progress

Dental suite buildout

2,400 square feet: reception, three operatories, a lead-lined X-ray room and sterilization. Framing inspection passed; MEP rough-in is next.

Kitchen remodel with base cabinets in and no counters yet
in progress

Kitchen remodel

Gutted to the studs, sink moved under the window, new island. Demo and rough-in are done and cabinets are going in.

Concrete footings and form boards in a backyard
in progress

Covered patio

A 22 by 13 foot covered patio on three footings, eight feet off the rear line. Permit is in and footings are formed.